Technology Index:
AbstractsProductivity Salts and Surface Contaminants UHP Technology Shipyards and Ships
PPI NBR: 63101-014 (REV 01) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for REPAIR TO BALLAST TANKS Surface Preparation Method of Water Jetting Cleaning,
Surface Preparation and Painting Requirements for Repair to Ballast Tank
Download this document: AC10022 PPI NBR: 63101-003 (REV 04) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for BILGES Surface Preparation Method of UHP Water Jetting or Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Bilges
Download this document: AC10023 PPI NBR: 63101-007 (REV 02) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for REPAIR TO MIL-PRF-24441 & AMERON BAR RUST 235
COATING SYSTEMS IN BILGES Surface Preparation Method of Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Spot Repair of Bilges
Download this document: AC10024 Collection, Holding, and Transfer Tanks PPI NBR: 63101-001 (REV 05) DATE: September 23, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for BALLAST TANKS, COLLECTION,
HOLDING AND TRANSFER TANKS, COMPENSATING FUEL TANKS, AND HIGH TRAFFIC INTERIOR
DECKS Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for: Ballast Tanks, Collection, Holding and Transfer Tanks, Compensating Fuel Tanks, and High Traffic Interior Decks
Download this document: AC10025 PPI NBR: 63101-008 (REV 03) DATE: September 23, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for AFFF STATIONS - DECK AND FOUNDATIONS Surface Preparation Method of UHP Water Jetting Cleaning, Surface Preparation and Painting Requirements for AFFF Stations Deck and Foundations.
Download this document: AC10026 PPI NBR: 63400-001 (REV 02) DATE: June 8, 2001 PRESERVATION
PROCESS INSTRUCTION (PPI) for RENOVATE / REPAIR / HEAD (DECK) Surface Preparation Method of Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Head Deck
Download this document: AC10027 PPI NBR: 63101-005 (REV 03) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for EXTERIOR TOPSIDE Surface Preparation Method of Abrasive Blasting or UHP Water Jetting Cleaning, Surface Preparation and Paintings Requirements for Exterior Topside Areas.
Download this document: AC10028 PPI NBR: 63101-002 (REV 03) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for FREEBOARD AND SUPERSTRUCTURE Surface Preparation Method of Abrasive Blasting or UHP Water Jetting Cleaning, Surface Preparation and Paintings requirements for Freeboard & Superstructure.
Download this document: AC10029 Powder Coatings, Turbine Intakes, Exhaust Louvers PPI NBR: 63125-001 (REV 03) DATE: June 12, 2001 PRESERVATION
PROCESS INSTRUCTION (PPI) for POWDER COATING AIR FLUIDIZED BED SYSTEM GAS
TURBINE BOLTED AIR INTAKE & EXHAUST CHEVRON LOUVERS Surface Preparation Method Of Burn-Off & Abrasive Blasting Cleaning, Surface Preparation and Powder Coating Requirements for Gas Turbine Ship Chevron Louvers
Download this document: AC10030 Decks, Non-Skid, Deck Gray Coating Systems PPI NBR: 63421-001 (REV 04) DATE: August 26, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for STEEL and ALUMINUM DECKS WITH LOW SOLAR ABSORBING
/ UV RESISTANT NON-SKID AND DECK GREY COATING SYSTEMS Surface Preparation Method of Abrasive Blasting or UHP Water Jetting Cleaning,
Surface Preparation and Painting Requirements for Steel & Aluminum Deck
Non-Skid Areas.
Download this document: AC10031 Mixing Rooms Aluminum Substrate PPI NBR: 63101-011 (REV 03) DATE: September 23, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) CG-47 CLASS (GUIDED MISSILE CRUISER) MIXING ROOMS
ALUMINUM SUBSTRATE Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Paintings Requirements for Mixing Room Aluminum Deck including up to 10’ on each bulkhead, exhaust piping flange and flange fasteners.
Download this document: AC10032 PPI NBR: 63101-010 (REV 03) DATE: September 23, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) DDG-51 CLASS (GUIDED MISSILE DESTROYER) MIXING ROOM
STEEL SUBSTRATE Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Paintings Requirements for Mixing Room Steel Deck, including up to 10’ on each bulkhead, exhaust piping flange and flange fasteners.
Download this document: AC10033 PPI NBR: 63101-009 (REV 02) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for REPAIR TO OVERBOARD DISCHARGE LINING Surface Preparation Method of Abrasive Blasting Cleaning,
Surface Preparation and Painting Requirements for Overboard Discharge Lining.
Download this document: AC10034 Head Coatings, Overhead Bulkheads PPI NBR: 63101-006 (REV 03) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for REPAIR / REPLACEMENT OF HEAD COATING SYSTEMS
(OVERHEAD / BULKHEADS) Surface Preparation Method of Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Repair / Replacement of Head Coatings (Overhead / Bulkhead Coating Systems.
Download this document: AC10035 PPI NBR: 63101- 000 (REV 09) DATE: August 16, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) CORE General
Overview of all of the preservations process instructions Title:
Cleaning, Surface Preparation and Painting Requirements for (area to be
prepared).
Download this document: AC10036 PPI NBR: 63101-017 (REV 01) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for RAST TRACK Surface Preparation Method of UHP Water Jetting and Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for Rast Track.
Download this document: AC10037 PPI NBR: 63421-002 (REV 04) DATE: June 10, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for STRATICA TILE Surface Preparation Method of Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Stratica Tile Areas
Download this document: AC10038 PPI NBR: 63101-012 (REV 03) DATE: September 23, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for VENT PLENUMS, DUCTS AND TRUNKS Surface Preparation Method of Abrasive Blasting or UHP Water Jetting Cleaning, Surface Preparation and Paintings Requirements for Vent Plenums, Ducts and Trunks.
Download this document: AC10039 PPI NBR: 63101-004 (REV 04) DATE: May 17, 2002 PRESERVATION
PROCESS INSTRUCTION (PPI) for WELL DECK OVERHEAD Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for: well deck overhead
Download this document: AC10040 Productivity
Study of Hydroblast Removal of Coatings Download this document: AC10058 NSRP 0329 Details of Using UHP in the restoration of the William Penn Statue. New ultrahigh-pressure water jetting systems
operating at 35,000 to 55,000 psi provide cleaning jets traveling at speeds up
to 3000 fps.
Download this document: AC10060 PPI NBR: 63101-001A (REV 01) DATE: September 23, 2002 PRESERVATION PROCESS INSTRUCTION (PPI) for POTABLE WATER TANKS Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for Potable Water Tanks.
Download this document: AC10067 Ballast Tanks and Floodable Voids PPI NBR: 63101-001B (REV 00) DATE: August 2, 2002 PRESERVATION PROCESS INSTRUCTION (PPI) for BALLAST TANKS and FLOODABLE VOIDS Surface Preparation Method of UHP Water Jetting (Approved For Test and Evaluation Only) Cleaning, Surface Preparation and Painting Requirements for Ballast Tanks and Floodable Voids.
Download this document: AC10068 Ballast Tanks - Marithane II System PPI NBR: 63101 Marithane II (REV 04) DATE: August 6, 2002 PRESERVATION PROCESS INSTRUCTION (PPI) for BALLAST TANKS Surface Preparation Method of Abrasive Blasting (Approved For Test and Evaluation Only) Cleaning, Surface Preparation and Painting Requirements for Ballast Tanks.
Download this document: AC10062 PPI NBR: 63101 T&E Armorseal 1000 HS
System PRESERVATION PROCESS INSTRUCTION (PPI) for HIGH TRAFFIC INTERIOR DECKS Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for High Traffic Interior Decks.
Download this document: AC10063 PPI NBR: 63101 T&E Interbond 998 (REV 01) DATE: May 17, 2002 PRESERVATION PROCESS INSTRUCTION (PPI) for BILGES Surface Preparation Method of UHP Water Jetting or Power Tool Cleaning Cleaning, Surface Preparation and Painting Requirements for Bilges.
Download this document: AC10064 Potable Water Tanks Based on Volume PPI NBR: 63101 T&E Sigmaguard CSF 85 PRESERVATION PROCESS INSTRUCTION (PPI) for POTABLE WATER TANKS with volume equal to or greater than 10,000 gallons. Cleaning, Surface Preparation and Painting Requirements for Potable Water Tanks with volume equal to or greater than 10,000 gallons.
Download this document: AC10066 PPI NBR: 63101 T&E Recyclable Ferrous
Metallic Abrasives PRESERVATION PROCESS INSTRUCTION (PPI) for BALLAST TANK Surface Preparation Method of Abrasive Blasting Cleaning, Surface Preparation and Painting Requirements for Ballast Tanks.
Download this document: AC10065 PPI NBR: 63101 T&E Three Coating Systems PRESERVATION PROCESS INSTRUCTION (PPI) for STEEL and ALUMINUM DECKS WITH AMERON INTERNATIONAL, CASTELLANO & CIE NON-SKID COATING SYSTEMS
Cleaning, Surface Preparation and Painting Requirements for Steel and Aluminum Decks.
Download this document: AC10069
|